哈希游戏
热门标签

usdt支付接口(www.trc20.vip):RHB increases BR, BLR\/BFR by 25 basis points

时间:1个月前   阅读:5   评论:1

皇冠信用网www.hg108.vip)是一个开放皇冠信用网即时比分、皇冠信用网开户的平台。皇冠信用网平台(www.hg108.vip)提供最新皇冠信用网登录,皇冠信用网APP下载包含新皇冠体育代理、会员APP,提供皇冠信用网代理开户、皇冠信用网会员开户业务。

KUALA LUMPUR: RHB Banking Group will revise its base rate (BR) and base lending/financing rate (BLR/BFR) upwards by 25 basis points effective July 13 in line with the increase in the overnight policy rate (OPR) by Bank Negara today.

,

usdt支付接口(www.trc20.vip)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键出售Usdt。

,

“RHB Bank Bhd, RHB Islamic Bank Bhd and RHB Investment Bank Bhd will increase its BR from 2.75% to 3.00% per annum, and will also revise the BLR/BFR from 5.70% to 5.95% per annum,” RHB said in a statement.

In line with the revision, RHB Bank and RHB Islamic Bank’s fixed deposit rates will also be revised upwards effective the same date.


转载说明:本文转载自Sunbet。

上一篇:皇冠体育官网开户:Market optimism continues ahead of peak corporate earnings period

下一篇:玩三公大吃小的技巧:英国首都伦敦城区东部发生街头枪战

网友评论

  • 2023-01-04 00:18:26

    KUALA LUMPUR: Protasco Bhd’s wholly owned subsidiary, HCM Engineering Sdn Bhd, has secured a contract worth RM299.2mil from K.I. Engineering Sdn Bhd.In a filing with Bursa Malaysia, Protasco said HCM had entered into a memorandum of agreement with K.I. Engineering to regulate the relationship with each other and set out their respective rights, duties and obligation in order to execute a contract to upgrade federal roads from Section 23.10 until Section 35.70 in Kulim, Kedah."Under the agreement, HCM Engineering shall share 70% of the profit from the project and shall act as the implementer to undertake the overall construction and financing of the project until its completion by Jan 27, 2026,” it said.Protasco said the project is expected to contribute positively to the group’s future earnings.这个很充实时间啊